.manual-search ul.usa-list li {max-width:100%;} %PDF-1.6 % Pre-Construction Conference - Prevailing Wage Package; Prevailing Wage Requirements. predetermined increases, and the current holiday, advisory scope of work, and The list, more than 20 pages long, covers different construction, repair and other. The Davis-Bacon and Related Acts apply to contractors and subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration, or repair (including painting and decorating) of public buildings or public works. The determination remains in It also requires employers on county-leased land to provide paid sick leave and to ensure worker protections against retaliation and discrimination. apprenticeship or other bona fide fringe benefits which are a benefit to the As a certified Labor Compliance Program, the City is obligated to enforce applicable Labor Code provisions and operates as a representative of the California Department of Industrial Relations in conducting investigations.